Ceramic Tile Production
Case Study II

Ceramic Tile Production

A 24/7 relentless operation where stopping the line is the ultimate failure.

The Limits of Intuition

High Consumption

Kiln runs 7/24 with high energy consumption.

Unpredictability

Kiln loaders are unpredictable, causing unexpected stops.

The Human Factor

Operators manually adjust feed rates based on intuition.

Waste

Suboptimal parameters wasting both time and energy.

Optimization at Scale

0

Decrease in Energy Consumption

0

Reduction in Loading Time

0

Estimated Total Annual Savings